IndonesiaEnglish mech@eng.ui.ac.id +62 21 7270032
IndonesiaEnglish mech@eng.ui.ac.id +62 21 7270032

Practical Work

Practical Work Essence :
1. Competence
2. Learning
3. Training
4. Ability
5. Experience
6. Growth
7. Skills
8. Knowledge

Practical Job Requirements :
1. Credits Earned >95 Credits
2. Fill in the IRS in the semester you are going to
3. KP period eight weeks

Practical Work Procedure
1. Practical Work Registration = https://bit.ly/Daftar_KP_NG
2. Confirmation of acceptance of Practical Work = https://bit.ly/Berangkat_KP_NG
3. Checking the Dashboard (Advisory Lecturer, Status, Location of KP) = https://bit.ly/Dashboard_KP_DTMFTUI
4. Filling in the Daily Report in the RKKP Book (Please ask the Department)
5. Submitting a KP Session = https://bit.ly/UjianKP_DTM_NG
6. Upload Final Report after revision = http://bit.ly/LaporanKP_Final
7. Values will be uploaded by the Advisory Lecturer or KP Coordinator

Regards,
Dr. Eng. Gerry Liston Putra, S.T., M.T.
Practical Work Coordinator

Contact Info


Mechanical Engineering Department
Faculty of Engineering Universitas Indonesia
UI Depok Campus 16424, Indonesia

mesin@eng.ui.ac.id

+62-21-7270032

Operational Time : 09.00-16.00 WIB ( Monday-Friday)

Student's Link